List of Tables

Table 1.1 Length of proposed pipeline through different terrain and landuse calsses en route. Table 2.1 Points surveyed along the CCKT Pipeline route. Table 3.1 Major rivers en route the proposed pipeline. Table 3.3 Phytosociological analysis of Attur Reserved Forests (RF IV). Table 4.1 Biotic disturbance operating in the rivers en route the pipeline. |
Last Updated: October 8, 2015