List of Tables


back

Table 1.1 Length of proposed pipeline through different terrain and landuse calsses en route.

Table 2.1 Points surveyed along the CCKT Pipeline route.

Table 3.1 Major rivers en route the proposed pipeline.

Table 3.2 Major rivers en route the proposed pipeline and their wildlife values.

Table 3.3 Phytosociological analysis of Attur Reserved Forests (RF IV).

Table 4.1 Biotic disturbance operating in the rivers en route the pipeline.