List of Plates & Figures


back

FIGURES

Fig. 1.1 Proposed route of CCKT Pipeline Project.

Fig. 3.1 Major rivers and other important wetlands within the pipeline corridor.

Fig. 3.2 Proposed route of the CCKT Pipeline along the Walayar reservoir.

Fig. 3.3 Reserved Forest area within the pipeline corridor.

Fig. 4.1 Suggested matrix for identification of impacts of CCKT Pipeline Project.

PLATES

Plate 2.1 Locations of take off (above) and terminal (below) points of the proposed pipeline project.

Plate 2.2 Paddy fields and plantations en route the proposed pipeline project.

Plate 2.3 The proposed pipeline route traverses through several wetlands.

Plate 2.4 Patches of Reserved Forests within the proposed pipeline corridor.

Plate 2.5 Observations were made in select wildlife habitats within the proposed pipeline corridor.

Plate 3.1 Several stretches of perennial rivers within the pipeline corridor support aquatic species of conservation significance.

Plate 3.2 Illustrations of species of Otters likely to occur in the rivers en route the proposed project.

Plate 3.3 Walayar reservoir is an important wetland habitat en route the proposed pipeline.

Plate 3.4 The proposed landfill area near take off point would be a direct loss of wetland ecosystem.

Plate 3.5 Teak plantations and moist deciduous forests en route the proposed pipeline.

Plate 4.1 Sand mining and industrial effluents have already impacted upon the ecology of several rivers en route.