The 510 MW, Teesta Hydroelectric Project, Stage - V proposed on Teesta river in Sikkim is one of the largest projects undertaken by NHPC to meet the power requirements for the eastern regional grid. The Teesta Hydroelectric Project, Stage - V, which is a run of the river scheme, has been planned for commissioning by the year 2007-08.

2.1 PROJECT LOCATION

The proposed Teesta Hydroelectric Project, Stage - V is located in eastern and northern districts of state of Sikkim between latitude 27o20’N to 28o15’N and longitude 88o00’E (Fig.1). A 96.45m high concrete gravity dam is proposed to be constructed two kilometers downstream of the confluence point of Teesta with Dikchu nallah (Plate 1 & 2). The underground Power house site is proposed to be located at Serwani village which is 5 km away from Singtam on Singtam - Mangan state highway. Two diversion tunnels are proposed on the right bank to divert the river water during construction of the main dam, which is located about 2 km downstream of confluence of Teesta river and Dikchu nallah.

Project profile

 

 

Project profile

 

Project profile

 

2.2 ECOLOGICAL SETTING

The Project area falls in the Biogeographic Province 2C (Rodgers and Panwar, 1988). The proposed Project area covers the stretch of nearly 23 km along river Teesta between Serwani village and Dikchu village. The entire area is inhabited by several villages with agricultural lands, village farms and pasture lands dominating the landuse. The Singtam - Mangan Road is the major motorable road that provides access to Project area. The Project area exhibits low forest cover because of biotic influences associated with human interspersions and degradation caused by extensive infrastructural development that has been in progress for a long time.

The dam will be constructed two kilometers downstream from the confluence of river Teesta and Dikchu nallah. The dependable discharge available throughout the year has been estimated as 60 cumecs and the gross head available to be 200 meters. Areas 5 km upstream on Tessta river from dam axis and 1 km upstream on Dikchu nallah from confluence point of Teesta and Dickhu will get submerged. The total area to be submerged is estimated to be around 67 ha. The underground Power house will be located near Singtam about 4 km upstream of the confluence of Rongnichu with Teesta and is expected to generate 100 MW of firm power with a installed capacity of 540 MW.

The watershed divide of the Teesta river in Sikkim is marked by the state’s international boundary with Nepal, Tibet and Bhutan. The total catchment area of river Teesta is 12,650 km2 of which roughly 9350 Km2 lies in hilly region. The upper and middle portions of the catchment are much wider compared to lower one. The catchment area of Teesta river upto proposed dam site of Teesta Hydroelectric Project, Stage - V at Dikchu, which is about 2.67 km downstream of Teesta Dikchu confluence is 4307 km2 and is fern shaped (Fig. 2).

Project profile

 

In the Project area, the river Teesta, generally flows in southwesterly direction and carves out a narrow gorge. The river cuts through the low-grade metamorphic sequence of quartzite and phyllites of Lesser Himalayan domain. The Project area falls in Zone IV of the Seismic Zoning Map of India as per ISI 1893-1975.

2.3 SALIENT FEATURES OF THE PROJECT

Teesta Project, Stage - V envisages generation of 510 MW power for the eastern regional grid by utilising water of river Teesta from the stretch between Dikchu bridge to Serwani Village. The catchment area at dam site is 4307 km2. This is in addition to the free drainage area of 2020 km2 as indicated in the EIA Report (Anon., 1998).

Under this Project, the following construction related works are envisaged:

1. A 96.45 m high and 182.50 m long concrete gravity dam.
2. Central ogee shaped five spill ways.
3. A 17.78 km long and circular Head Race Tunnel to discharge water from desalting chamber to Power house.
4. An underground Power house with three turbines.
5. Three D-shaped Tail Race Tunnels to discharge water from the Power house back to the river Teesta.
6. Switchyard of size 80 m 5 20 m at 380 m elevation near Tail Race Tunnel.

The salient features of the project are summarized below:

DESCRIPTION

LOCATION

State  Sikkim
River  Teesta
Dam Site  2 km downstream of the confluence of Dikchu and Teesta river near village Dikchu
Longitude 88030’20” E
Latitude 27023’08” N


POWER HOUSE SITE

Longitude 88027’30” E
Latitude 27015’00” N
Access to the project from Bagdogra Airport  Distance to dam site - 140 Km
  Power house site - 110 Km
Railhead  New Jalpaiguri & Siliguri


HYDROLOGY

Catchment area 4307 km2
Free draining area 2020 km2
Design discharge  9500 cumec
  Probable Maximum Flood (PMF)

 

RESERVOIR

Full Reservoir Level (FRL)  EL 579.00 M
Max. Reservoir Level (MWL)  EL 580.72 M
Min. Draw Down Level (MDDL)  EL 568.00 M
Gross storage up to FRL 13.52 MCM
Live storage  6.3 MCM


DAM

Type Concrete gravity dam
Height of dam from deepest foundation level  96.45 m
Elevation of top of dam EL 583.20 M
Length of dam at top 182.50 m


SPILLWAY

Design flood 9500 cumec (PMF)
Type  Central Ogee shape
Crest level EL 551.00 M
Maximum head over crest (w.r.t. FRL) 28.0 m

 

Type of gate Radial-sluice
Number & size  5 Nos. (11 m wide x 16 m high)
Energy dissipation Trajectory bucket
Top of road  EL 583.2 M


DIVERSION TUNNELS

Number 2
Shape & Size Circular 12.5 m dia
Lengths  410 m & 550 m
Diversion flood 2700 cumec


COFFER DAM

Length : Upstream 131 m
  Downstream 78 m
Height : Upstream 22 m
  Downstream 14 m


INTAKE

Invert Level :  EL 556.50 M
Number & size  3 Nos. 6.5 m dia. each
Design discharge 117 cumec each


DESILTING CHAMBER

Type Dufour type
Length  315 m
Number of chambers  3
Design discharge  117 cumec each chamber
Particle size to be removed 0.2 mm and above (90%)
Size of Chamber  20 m (width) x 22.5 (height)


HEAD RACE TUNNEL

Number One
Shape  Circular
Size  9.5 m dia.
Length 17.78 km
No. of Adits  5
Design discharge 292.37 cumec


SURGE SHAFT

Type  Semi Underground
Diameter 25.0 m
Height  92.0 m
Maximum Surge Level  EL 615.0 M
Minimum Surge Level EL 536.0 M


PENSTOCK/PRESSURE SHAFT

Type  Vertical pressure shaft
Number 3
Design discharge through each (cumec) 97.45 cumec
Diameter 4.7 m dia each
Length 344.0 m


POWER HOUSE

Type Underground
Type of turbine  Francis
Design discharge (cumecs) - 3 units 292.37 cumec
Installed capacity 510 MW
Size of machine hall 100.5m x 22 m x 49 m
No. & capacity of units  3 Nos. of 170 MW each
Service bay level EL 367.30 M
Generator floor elevation EL 362.30 M
Bottom of draft tube EL 342.20 M
Centre line of turbine EL 354.70 M
Minimum tail water level EL 359.50 M
Maximum tail water level EL 360.00 M
Maximum flood level  EL 370.75 M
(For Q = 9500 cumec)  
Gross head 216.73 m
Net head  197.57 m

 
TAIL RACE TUNNEL

Type D – shaped and 3 in number
Length 135 m
Width  6 m


SWITCHYARD

Type  Surface
Size 80 m x 20 m


POWER GENERATION

Installed Capacity  510 MW
Annual Energy Generation  
- 90% Dependable Year  2573 GWH


2.4 OTHER PERIPHERAL DEVELOPMENTS

Several infrastructural developments that are associated with the Project are planned at various sites and locations. Some of these proposed developments include:

1. Project office and residential/non residential complexes
2. Workshops and ware houses
3. Construction facility areas and contractor’s colonies/workshops
4. Transit camp/depot at Siliguri
5. Construction Power
6. Telecommunication
7. Safety arrangements
8. Road communication network

Apart from the development of roads proposed in the area under the Project, all the other peripheral developments would largely be confined to the land acquired by the Project Authorities. It is possible that the Project Authorities would acquire forest/private land for road up gradation and expansion. The details of road to be upgraded or constructed for the implementation of the Project are provided in Table 2.1. The width of the roads proposed to be constructed would be generally between 4.5 to 8 m as indicated in the feasibility report of NHPC (Anon., 1998).

Table 2.1 Details of new roads to be constructed in the Project area.

Location Length (km) Cross drainage structures
Main road to right bank dam site 4  
Right bank quarry and diversion tunnel 2  
Access road to dam site colony 3  
Access road to clay and rock quarry 10  
Adit I 3  
Adit II 2 Ten meters R-30 Bridges, two in number
Adit III 3 Two culverts & two causeways
Access road to Power house and other facility 4 One bridge and two culverts
Access road from right bank to Power house 3 One bridge on Teesta river
Access road to surge shafts and pen stocks 2  
Total 36 km

Besides the road communication network, one 100m X 100m size helipad is proposed to be built on the left bank of the river in front of Power house site.