Proposed Project

The proposed Project named as "Upgradation of HBJ Pipeline System" is for augmenting the throughput of the existing HBJ pipeline system from 18.2 to 33 MMSCMD. The new pipeline will originate from the existing compressor station at Bijaipur and terminate at the existing terminal at NTPC, Dadri. The total length of the pipeline is about 505 km. |