Project Details


back

The salient features of the three proposed mining projects are provided below.

Proposed Akrimota Lignite Mining Project

(i) Total mine lease area

: 2224.00 ha.

Revenue `waste land'

: 1560.00 ha.

Private land

: 664.00 ha.

Forest land

: nil

 (ii) Mine life

: 40 years

(iii) Total reserves

: 81.80 MMT

(iv) Extractable lignite reserves

: 55 MMT

(v) Stripping ratio

: 1:2.45 Tons/m3

(vi) Proposed annual production

: 1.5 MMT

(vii) Utilisation of mine product

: Fuel for captive power plant

(viii) Mining technology to be adopted

: Mechanised open cast mining

(ix) Land lock due to external dumps

: 104.00 ha.

(x) Top soil dump stockpile

: 11.0 ha.

(xi) Back filling

: Back filling proposed after 3 years

(xii) Void/Water body area

 : 58.25 ha.

(xiii) Man power employment

: 675 persons/day

 

Proposed Mata-no-Madh Lignite Mining Project

 (i) Total mine lease area

: 1805.17 ha.

Revenue waste land

: 1314.71 ha.

Private land

: 490.46 ha.

Forest land

: nil

 (ii) Mine life

: 40 years

(iii) Total reserves

: 24.60 MMT

(iv) Extractable lignite reserves

: 24.60 MMT

(v) Stripping ratio

: 1:12.38 Tons/m3

(vi) Proposed annual production

: 6 MMT

(vii) Utilisation of mine product

: Meet lignite demands of industries

(viii) Mining technology to be adopted

: Mechanised open cast mining

(ix) Land lock due to external dumps

: 39.00 ha.

(x) Top soil dump stockpile

: 18.0 ha.

(xi) Back filling

: No.

(xii) Void/Water body area

: Not clear

(xiii) Man power employment

: 276 persons/day

 

Proposed Umarsar Lignite Mining Project

(i) Total mine lease area

: 2683.28 ha.

Revenue waste land

: 2407.40 ha.

Private land

: 257.88 ha.

Forest land

: nil

(ii) Mine life

: 22 years

(iii) Total reserves

: 26.60 MMT

(iv) Extractable lignite reserves

: 22 MMT

(v) Stripping ratio

: 1:9.10 Tons/m3

(vi) Proposed annual production

: 1.0 MMT

(vii) Utilisation of mine product

: Meet lignite demands of industries

(viii) Mining technology to be adopted

: Semi open cast mechanised

(ix) Land lock due to external dumps

: 110.75 ha.

(x) Top soil dump stockpile

: 35.0 ha.

(xi) Back filling

: Back filling proposed after 3 years

(xii) Void/Water body area

: Not clear

(xiii) Man power employment

: 739 persons/day