Break up of the Forest Area Required for clear felling

The total area required for implementation of the Omkareshwar Project falls in three districts of Madhypa Pradesh- Khandwa, Khargone and Dewas. The largest requirement of clear felling of forest area (5756.76) is obviously in the area of reservoir of the proposed project. Forest area is also required to be cleared for the construction of power house, dam seat, and magazine area, canal alignment and quarrying for material for construction and land leveling. The details of the forest area required to be clear felled for defined purposes under the project are presented inTable 2.
Table 2. Break up of forest area under submergence.
S.No. | Purpos | Forest area required (ha) |
1 | Submergence | 5277 + 479.76 = 5756.76 |
2 | Power house | 10.35 |
3 | Dam seat | 11.54 |
4 | Magazine area | 3.2 |
5 | Quarry | 8.0 |
6 | Canals | 40.00 |
7 | Others | - |
Total | 5829.85 |
From the project layout and the details of landuse in the project area provided by NVDA, the district wise break up of the total forest area required for the project establishes that the largest area (4311.11 ha) would be required to be clear felled in District Khandwa. The area under submergence comprises the forest area under all the three districts of Khandwa (4238.02 ha ), Khargone (153.53 ha) and Dewas (885.45 ha) while the requirement of forest for other peripheral construction work for quarry, power house, canal and colonies is restricted to only forest divisions of Khandwa district (Table 3).
Table 3. District wise break up of total forest area required under project.
District | Area under submergence | Construction of dam power house, canal quarry etc. | Total (ha) |
Khandwa | 4238.025 | 73.09 | 4311.115 |
Khargone | 153.53 | Nil | 153.53 |
Dewas |
885.445 | Nil | 885.445 |
Total | 5277.00 | 73.09 | 5350.09 |
The details of the area of the forests of the three districts falling under the reservoir at varying levels of impoundment (Table 4) provides the basis for justifying the extent of forest clearance within the area of reservoir.
Table 4. Forest area to be affected due to submergence in the three districts.
Area affected under reservoir (ha.) | ||||||
S.No. | District |
M.W.L |
F.R.L |
F.R.L-2 | M.D.D.L. | F.R.L-4 m |
1 | Khandwa | 5428.976 | 4238.025 | 3425.299 | 3005.467 | 2552.847 |
2 | Dewas | 1169.092 | 885.445 | 779.560 | 683.500 | 603.480 |
3 | Khargone | 222.630 | 153.530 | 117.630 | 96.890 | 83.820 |
Grand Total | 6820.698 | 5277.000 | 4322.489 | 3785.857 |
3240.147 |
Last Updated: January 21, 2014